Filing time for construction plans: The time required for the City Engineer to review and process the construction plans shall be a maximum 21 days per Article 10-IV-5 of the Kerrville Subdivision Ordinance. Most reviews are completed in 14 days.
Standard specs and contract documents for city construction projects (January 2005): These specifications are identical to the Subdivision Construction specs above with additional information (i.e. Section 000 which is the Contract Documents and the Table of Contents have been updated to include section 000). Pages 480.04A, 480.05A and 480.05B were revised or added on 4-21-10.