The project’s scope to include rehabilitation for four (4) lift stations owned and operated by the City of Kerrville. The four lift stations include the Broadway lift station and the Airport lift station (Shown in map location). As well as rehabilitation improvements for two additional lift stations owned and operated by the City, the Commerce lift station, and the Commanche Trace lift station. For the Commerce lift station, the proposed rehabilitation design will include electrical and SCADA component replacements due to corrosion issues caused by the H2S gas at the station. Additionally, a new Titus Twister aerator with ozone gas injection unit will be installed to prevent H2S development at the Commerce lift station as well as downstream infrastructure. For the Commanche Trace lift station, electrical and pump control upgrades for the replacement of the existing 600 gpm pumps with 1,150 gpm pumps.
|
|
|
| 4/9/2025 12:00 AM
|
|
|
| Open Until Contracted
|
|
|
| Bids will only be received electronically through www.civcastUSA.com.
|
|
|
| May 7, 2025, at 3:00 p.m.
|
|
|
| April 23, 2025, at 3 p.m.
|
|
|
| All questions/inquiries regarding this project shall be directed to the Design Engineer through the CivCast USA website by Thursday, May 1, 2025, at 5:00 p.m. CST. Questions received after the deadline for questions may not be answered. Interpretations or clarifications considered necessary by the City in response to such questions will be issued by Addenda.
|
|
|
| Yes
|
|
|
The bidding documents, plans, specifications, etc. may be examined by all bidders at the following website: https://www.civcastusa.com/project/67f68cb834c39700eef66a60/plans
|
|
|
| It is the sole responsibility of all plan holders, whether they have received digital downloads or paper copies of the plans and specifications, to periodically check for Addenda which may have been posted on the Civcast USA website.
|
|
|
| See contract documents
|
|
|
| This website will be updated with addenda, plan holder lists, bid tabulations, additional reports or other information relevant to bidding the Project. Official plan holders list will only be the list maintained by The City through the Civcast website. It is the sole responsibility of all plan holders, whether they have received digital downloads or paper copies of the plans and specifications, to periodically check for Addenda which may have been posted on the Civcast USA website.
|
|